Repair work to the Sanctuary steps & Sacristy floor, July 2020 Post date 28/07/2020 IMG-20200917-WA0000 IMG-20200917-WA0001 IMG_20200725_114539 IMG_20200725_114545 IMG_20200725_114608 IMG_20200725_114643 IMG-20200803-WA0000 IMG-20200803-WA0001 IMG-20200803-WA0002 IMG-20200803-WA0003 IMG-20200803-WA0004 ← 2019 FHC & Confirmation → St Mary’s – Ready to Re-Open